loading

Induction Heating Equipment: Market oriented, technology driven and quality based

High Frequency Hardening Equipment_Kehua

by:Kehua     2022-07-21
Safety operation procedures for high-frequency quenching equipment 1. The operator is allowed to operate after passing the examination and obtaining the operation certificate. The operator should be familiar with the performance and structure of the machine, and must abide by the safety and shift system. 2. There must be more than two people to operate the high-frequency equipment and designate the person in charge of the operation. A 3 During operation, check whether the protective shield is in good condition, and idlers are not allowed to enter during work. 4. Before working, check whether the connection of each part of the equipment is reliable, whether the quenching machine tool is running well, and whether the mechanical or hydraulic transmission is normal. 5. Prepare to turn on the water pump during work, check whether the cooling water pipes are smooth, whether the water pressure is between 12kg-2kg, and do not touch the cooling water of the equipment with your hands. 6. The power transmission preheating is performed at the first gear, the filament is preheated for 30min-45min, and then the second gear is performed, and the filament is preheated for 15min. Close and continue to adjust the phase shifter to high voltage. After adding the high frequency, the hand is not allowed to touch the busbar and the inductor. 7. Install the sensor, connect the cooling water, and drain the workpiece before the sensor can be heated by electricity. It is strictly forbidden to send electricity without load. When replacing the workpiece, the high frequency must be stopped. If the high frequency cannot be stopped, the high voltage should be cut off immediately or the emergency switch should be connected. 8. During the operation of the equipment, pay attention to the fact that both the positive flow and the powder flow are not allowed to exceed the specified value. 9. All the doors should be closed when working. After the high voltage is closed, do not move behind the machine at will, and it is strictly forbidden to open the door. 10. If abnormal phenomena are found in the working process of the equipment, the high voltage should be cut off first, and then the analysis and troubleshooting should be done. 11. The room should be equipped with ventilation equipment to remove the flue gas and waste gas emitted during quenching and protect the environment. The indoor temperature should be controlled at 15-35C. 12. After working, first disconnect the anode voltage, then cut off the filament power supply, and continue to supply water for 15min-25min, so that the electronic tube is fully cooled, and then clean and check the equipment, keep it clean and dry to prevent electrical components from discharging and being broken down. When opening the door for cleaning, discharge the anode, grid, capacitor, etc. first.
Custom message
Chat Online
Chat Online
Chat Online inputting...