Induction Heating Equipment: Market oriented, technology driven and quality based

How to maintain a high temperature cooling tower if it needs to be shut down for a long time-【Lingyan Electromechanical】Industrial Cooling Tower

by:Kehua     2022-09-16
​The high temperature cooling tower relies on the combination of hot water and cold air for heat exchange to achieve the cooling effect. So how do we maintain it if it is to be idle for a long time and not used? (1) First, after the cooling equipment is shut down, first discharge the excess water inside the cooling tower water receiving tray and the pipeline, and clean up the sludge and other impurities inside the cooling equipment water receiving tray. (2) Check the motor circuit for damage and aging. (3) Overhaul the fasteners of the cooling tower, and apply lubricating oil or anti-rust paint for maintenance. (4) Overhaul the damage of the packing and water distribution nozzles inside the cooling tower, and replace the damaged ones immediately; and clean the impurities inside the packing. (5) Overhaul the cooling tower fan, apply anti-rust paint or lubricating oil for anti-corrosion maintenance, and seal it with plastic film after treatment; check the gear oil in the reducer. (6) Overhaul the overall steel structure frame of the cooling tower. If there is rust, please do anti-corrosion maintenance after removing the rust.
Shandong Kehua Intelligent Equipment Co.,Ltd. is famous for creating innovative products like the induction heating system and supporting their market leadership with savvy marketing campaigns to build an elite brand.
For more advice on tips, please visit our website Kehua Electric Furnace. Do not hesitate to contact us if you are interested.
We sells induction heating system and focus on operational procedure and manufacturing facilities high frequency induction heating machine.
Custom message
Chat Online
Chat Online
Chat Online inputting...