loading

Induction Heating Equipment: Market oriented, technology driven and quality based

Some problems should be paid attention to when handling glass fiber reinforced plastic cooling tower-【Lingyan Electromechanical】Industrial Cooling Tower

by:Kehua     2022-09-23
When the FRP cooling tower is assembled and ready for normal operation, the following necessary checks should be done first: 1. Check whether there is enough gear oil in the reducer. Do not run the reducer without oil; if it is a belt reducer, please check the belt Check whether there is any debris in the belt cover and pulley; 2. Please confirm whether the outriggers of the FRP cooling tower are fixed to the foundation; 3. Check whether the line is out of phase and whether the voltage is 380V; 4. Turn on the motor and the fan is running Turn off after 20 seconds, check whether the fan rotates clockwise, do not rotate in the opposite direction; and check the operation of the fan to see if there is any abnormal noise. 5. Turn on the water pump, and the cooling equipment must not run the motor idling for a long time without water; 6. Make sure that the current value of the cooling tower motor is within the normal range. If the current is too large, please check the voltage. If the voltage is too low, it will If the voltage is normal, check whether the angle of the fan blade of the FRP cooling equipment is at a normal value; if the above problem is normal, then check whether the cooling tower reducer has oil; 7. The FRP cooling tower should be checked for cooling after continuous operation of 100-120 hours. Whether the fasteners of the tower fan are loose, re-fix if necessary; 8. Check whether the screws connecting the FRP cooling tower body and the legs of the cooling tower to the foundation are loose, and re-fix if necessary; 9. The belt decelerates after the cooling tower runs for ten days Check whether the belt is loose or not, and check whether the gear reducer is less oil; after two months of continuous operation, please replace the belt of the belt reducer, and replace the gear oil of the gear reducer; 10. After the FRP cooling equipment has been running for two months, please clean the cooling tower 11. Check whether the water replenishment device is effective.
Anyone who has seen the latest high frequency induction heating machine induction heating system in operation cannot help but be impressed with how far the technology has progressed over the past few years.
You will find a wide variety of for sale for virtually any high frequency induction heating machine needs. Keep in mind how you plan to use the , and talk with a professional about the model and features that are right for your application. Go to Kehua Electric Furnace for on sale.
Shandong Kehua Intelligent Equipment Co.,Ltd. is a new company that provides expertise in search marketing solutions for business on a worldwide basis.
induction heating system has a very good repute over the global market.
Custom message
Chat Online
Chat Online
Chat Online inputting...